A large quantity of standard and special lintels have been supplied to buildings DS1 and DS2 at Canary Wharf, London
The Naylor technical team worked closely with both the London office and site to determine the non standard sections and shaped lintels which not only suited the varying wall widths and load carrying requirements but also produced fire resistance of up to 90 minutes.